Failing basement pipes replaced
- Work
- Plumbing
- Where
- Crooksville
- Finished
- Aug 5, 2026

Corroded galvanized supply pipes replaced with new copper in a day, with every fixture kept running.
The galvanized pipes had narrowed to the point where the shower barely ran. We replaced the main supply and the branch lines to the kitchen and bath.
Dana’s crew kept water running to the house during the day and tested every fixture before leaving.
The result
Full pressure at every faucet and no more rusty water.